our company and jiangsu sumeida shipping engineering co., LTD., jointly invested and Zhenjiang shipyard group is responsible for the construction,The second sea camel type 48500DWT heavy lift general cargo carrier (TONG DA) has been delivered successfully at March 19th, 2018.