our company and jiangsu sumeida shipping engineering co., LTD., jointly invested and Zhenjiang shipyard group is responsible for the construction,The third sea camel type 48500DWT heavy lift general cargo carrier (TOP DILIGENCE) has been delivered successfully at September 28, 2018.